Pre-commissioning, commissioning, and startup advisory for safe handover
Commissioning and startup represent the highest-risk period in a plant's lifecycle — incomplete punch items, untested interlocks, and inadequately trained operators are the recurring precursors to first-year incidents. Arborion Global embeds structured Pre-Startup Safety Review (PSSR) discipline, manages the system-by-system turnover process, and supports phased process introduction to ensure the plant enters operation in a verified, documented, and safe condition. Our engineers have hands-on experience commissioning process units across oil and gas, chemicals, and power generation.

Define MC, pre-commissioning, commissioning, and startup phases; assign system boundaries and completion milestones.
Mechanical completion checks, system flushing, hydrostatic testing, instrument calibration, and preservation verification.
Systematic PSSR per OSHA/CCPS checklist; identify and close punch items before any process introduction.
Instrument loop checks, interlock and ESD function testing, DCS/SIS configuration verification, and control tuning.
Phased process introduction against pre-agreed ramp schedule; monitor performance, address snags, verify acceptance criteria.
Execute contractual acceptance tests; compile as-built documentation package; issue formal handover certificate.

Complete Commissioning & Startup Support scope — every calculation, drawing, specification, and construction support activity.
Speak with our team to scope an engagement tailored to your facility, regulatory context, and lifecycle stage.