Contractors OSHA PSM 1910.119(h)
We select contractors on safety performance, orient them before the job, track injury and illness and evaluate them periodically
Contractors OSHA
PSM 1910.119(h)
OSHA PSM 1910.119(h) covers the maintenance, repair, turnaround, major renovation and specialty work that contractors perform on or near your covered processes. The element divides responsibility cleanly, and our team builds a programme that honours both halves. The employer obligations under (h)(2) cover selecting contractors on their safety performance, sharing hazard information, running pre job orientation, tracking injuries and illnesses and evaluating performance over time. The contractor obligations under (h)(3) cover employee training, documented competency, supervisor accountability for safety, hazard reporting and adherence to your safety rules. Without a structured programme, contractor incident rates have historically run two to five times those of your direct workforce. We close that gap and integrate the programme with pre qualification frameworks such as ISNetworld, Avetta and ConstructSecure as well as India's OISD STD 149.

How the study is executed
A structured, facilitated process that runs from scope definition through close out and produces defensible, actionable outputs.
Per (h)(2)(i), build pre qualification criteria, TRIR / LTIFR threshold, OSHA citation history, insurance certificate, align with ISNetworld / Avetta / OISD 149.
Per (h)(2)(ii) and (iii), pre mobilisation orientation covering site hazards, evacuation, PTW system, emergency response.
Per (h)(2)(iv), specify reporting requirements, TRIR / LTIFR / OSHA recordable / near miss with monthly aggregation.
Per (h)(2)(v), evaluate contractor safety performance during and after engagement, document for selection decisions.
Tier appropriate supervision intensity, continuous (Tier 1 high hazard), intermittent (Tier 2), periodic (Tier 3).
End of contract HSE scorecard, lessons learned, re engagement decision integrated with procurement database.

What the study covers in full
Outcomes of Contractors OSHA PSM 1910.119(h)
- Contractor incident rates brought in line with your own workforce
- Pre qualification screens out contractors who carry high risk
- Strong field supervision prevents permit to work failures
- Periodic evaluation drives steady improvement
- A documented record that defends your position under OSHA 1910.119(h)
- Coverage that maps to CCPS RBPS Element 11
- Alignment with OISD STD 149 in India
- Conformance with the contractor provisions of Factories Act Section 41B
- Less downtime caused by contractor work
- Higher turnaround quality
- Tighter integration between your crews and contractor crews
- Clear visibility into procurement quality
- Reduced liability from contractor incidents
- A defensible record your insurer can rely on
- Lower workers compensation exposure
- Better pricing from a well managed contractor pool
Codes & standards we work to
Triggers that signal the need
Where Contractors OSHA PSM 1910.119(h) applies
Wellheads, separators, gas compression, FPSO topsides, produced water systems.
Distillation columns, reactors, heat exchangers, storage spheres, LPG handling.
Cryogenic exchangers, liquefaction trains, BOG compressors, storage and sendout.
Reactive systems, batch reactors, solvent handling, runaway reaction scenarios.
Boilers, HRSGs, steam headers, hydrogen systems, ammonia SCR units.
Sterile vessels, CIP/SIP, pressure fermenters, solvent recovery, spray dryers.
Tangible deliverables
- A contractor pre qualification framework under (h)(2)(i)
- A pre mobilisation orientation package
- An injury and illness tracking process under (h)(2)(iv)
- A periodic evaluation scorecard
- A supervision plan matched to the risk of the work
- A job closeout review protocol