Pre Startup Safety Review (PSSR) OSHA PSM 1910.119(i)

We verify that design, construction and the supporting safety systems are ready before highly hazardous chemicals enter the process

What this study delivers

Pre Startup Safety Review
(PSSR) OSHA PSM 1910.119(i)

OSHA PSM 1910.119(i) is the final gate before highly hazardous chemicals enter a new or a modified process, and our team runs it as a genuine check rather than a signature on the way out the door. The element asks you to confirm that construction and equipment match the design specifications under (i)(2)(i), that the safety, operating, maintenance and emergency procedures are in place under (i)(2)(ii), that the recommendations from your process hazard analysis have been resolved or implemented under (i)(2)(iii), and that operator training is complete under (i)(2)(iv). It is the practical expression of CCPS RBPS Element 14 on operational readiness. Williams Olefins, Tesoro Anacortes and BP Texas City all carried pre startup review findings in their CSB reports, incidents that happened because the formal gate was either skipped or held without real substance. We make sure your gate has substance.

Pre Startup Safety Review (PSSR) OSHA PSM 1910.119(i) Overview
Study execution

How the study is executed

A structured, facilitated process that runs from scope definition through close out and produces defensible, actionable outputs.

PSSR Scope Definition

Per (i)(1), trigger PSSR for new construction or MOC driven modification before HHC introduction, align with corporate PSSR procedure.

Walk Down Protocol

Multi discipline walk down, process, mechanical, electrical, instrumentation, HSE, verify construction matches P&ID, document deviation resolution.

PHA Action Close Out

Per (i)(2)(iii), confirm PHA / HAZOP / LOPA / SIL actions closed or risk accepted with documented evidence.

Procedure & Training Verification

Per (i)(2)(ii) and (iv), confirm operating procedures updated and operator training complete with documented competency.

MI / SIS / HAC Sign Off

Mechanical integrity, SIS commissioning (FAT / SAT), HAC drawings, ESD / F&G commissioning, align with relevant codes.

Leadership Signoff

Site leader and HSE manager signoff before HHC introduction, specify authorisation hierarchy and audit trail.

Pre Startup Safety Review (PSSR) OSHA PSM 1910.119(i) Scope
Study scope

What the study covers in full

We confirm that construction and equipment match the design under (i)(2)(i)
We confirm that operating and emergency procedures are in place under (i)(2)(ii)
We confirm that process hazard analysis recommendations are resolved under (i)(2)(iii)
We confirm that operator training is complete under (i)(2)(iv)
We run a multi discipline walk down protocol across the plant
We secure site leadership signoff before any highly hazardous chemical is introduced
Why it matters

Outcomes of Pre Startup Safety Review (PSSR) OSHA PSM 1910.119(i)

Startup Incident Prevention
  • Catches the incident pattern that so often follows a modification
  • Confirms that hazard analysis actions are closed before live operation
  • Confirms that operator training and procedures are current
  • Provides a real final gate before any highly hazardous chemical is introduced
OSHA (i) Defence
  • A documented record that defends your position under OSHA 1910.119(i)
  • Coverage that maps to CCPS RBPS Element 14
  • Alignment with the CCPS operational readiness guidelines
  • Conformance with the procedural requirements of Factories Act Section 41B
Startup Readiness
  • A lower rate of startup errors
  • A cleaner handover to the operating crew
  • Stronger close out of hazard analysis actions
  • Genuine integration across every engineering discipline
PSSR Programme ROI
  • Avoidance of post startup incident cost
  • Less commissioning rework
  • A defensible record your insurer can rely on
  • A faster path to steady state operation
Standards & references

Codes & standards we work to

OSHA 29 CFR 1910.119(i)EPA RMP 40 CFR 68.77 Pre Startup ReviewCCPS RBPS Element 14 Operational ReadinessCCPS Guidelines for Performing Effective Pre Startup Safety ReviewsISA 84 and IEC 61511 SIS Commissioning VerificationFactories Act 1948 Section 41B India
When to engage

Triggers that signal the need

You receive an audit finding under OSHA 1910.119(i)A change requires a review before restartYou are restarting after a turnaroundYou are commissioning new constructionA post incident review questions your operational readiness
Industries served

Where Pre Startup Safety Review (PSSR) OSHA PSM 1910.119(i) applies

Oil & Gas, Upstream

Wellheads, separators, gas compression, FPSO topsides, produced water systems.

UpstreamOffshoreFPSO
Refineries & Petrochemicals

Distillation columns, reactors, heat exchangers, storage spheres, LPG handling.

RefiningPetrochemical
LNG & Gas Processing

Cryogenic exchangers, liquefaction trains, BOG compressors, storage and sendout.

LNGCryogenic
Specialty Chemicals

Reactive systems, batch reactors, solvent handling, runaway reaction scenarios.

ReactiveBatch
Power Generation

Boilers, HRSGs, steam headers, hydrogen systems, ammonia SCR units.

PowerHydrogen
Pharma & Food

Sterile vessels, CIP/SIP, pressure fermenters, solvent recovery, spray dryers.

PharmaFood & Bev
What we deliver

Tangible deliverables

  • A pre startup review procedure with a defined trigger and scope
  • A multi discipline walk down checklist
  • A verification record showing hazard analysis actions closed out
  • A procedure and training verification register
  • A mechanical integrity, instrumented safety and hazardous area commissioning signoff
  • A leadership signoff and authorisation record
Get Started