Process Safety Management Systems

Process Safety Information (PSI) OSHA PSM 1910.119(d)

Chemistry, technology and equipment information kept current and accessible

What this study delivers

Process Safety Information (PSI)
OSHA PSM 1910.119(d)

OSHA PSM 1910.119(d) is the foundational documentation element, the compilation of written process safety information that the employer has to complete before conducting any PHA. PSI breaks into three categories. The first is (d)(1) chemical hazard information covering toxicity, PELs, physical data, reactivity and corrosivity. The second is (d)(2) technology information covering the block flow diagram, the process chemistry, the maximum intended inventory, the safe operating limits and the consequence of deviation. The third is (d)(3) equipment information covering materials of construction, P and IDs, electrical classification, relief device sizing and design codes. The failure mode of this element is gradual erosion. Modifications happen, MOC documentation lags, the P and IDs drift away from reality, and the PSI register turns into a historical record rather than a working document. Every CSB major incident report carries PSI findings, and our team keeps the register live so that yours does not.

Process Safety Information (PSI) OSHA PSM 1910.119(d) Overview
Study execution

How the study is executed

A structured, facilitated process that runs from scope definition through close out and produces defensible, actionable outputs.

PSI Inventory Baseline

Catalogue required PSI per (d)(1) / (d)(2) / (d)(3), identify gaps, version control issues, accessibility constraints.

Chemical Hazard Information

Per (d)(1), compile SDS, GHS classification, toxicity data, physical properties, reactivity per CHETAH / Bretherick.

Technology Information

Per (d)(2), assemble BFD, process chemistry, maximum intended inventory, safe upper / lower limits, consequence of deviation.

Equipment Information

Per (d)(3), compile MOC, P&IDs, electrical classification, relief device sizing per API 520/521, ventilation, design codes.

MOC & Update Discipline

Specify MOC trigger for PSI update, enforce update before MOC closure, track PSI currency as leading indicator.

Operator Access Provision

Ensure operating teams can access PSI relevant to their unit, integrate with EDMS and shift handover.

Process Safety Information (PSI) OSHA PSM 1910.119(d) Scope
Study scope

What the study covers in full

We compile chemical hazard information per (d)(1) covering SDS, GHS, reactivity and toxicity
We compile process technology information per (d)(2) covering the BFD, the chemistry, the inventory and the operating limits
We compile equipment information per (d)(3) covering MOC, the P and IDs, the HAC, the relief sizing and the codes
We complete the PSI before the PHA per the (d) preamble
We integrate MOC so the PSI stays current
We keep the PSI accessible to your workforce and your contractors
Why it matters

Outcomes of Process Safety Information (PSI) OSHA PSM 1910.119(d)

PSI Driven Decision Quality
  • We let your operators decide on current data
  • We ground PHA quality in an accurate baseline
  • We make sure relief sizing matches the operating envelope
  • We make sure the HAC drawings match the installed equipment
OSHA (d) and PSM Strength
  • We give you a confident response on OSHA 1910.119(d)
  • We produce CCPS RBPS Element 6 evidence
  • We satisfy the MSIHC Schedule 1 chemical information requirement
  • We satisfy ISO 45001 Cl.7.5 documented information
Documentation Discipline
  • We speed the MOC cycle through current PSI
  • We lift PHA quality
  • We sharpen troubleshooting
  • We hold contractor access discipline
PSI Quality ROI
  • We help you avoid a regulatory citation
  • We reduce incident cost
  • We lift engineering productivity
  • We strengthen your insurance position
Standards & references

Codes & standards we work to

OSHA 29 CFR 1910.119(d)EPA RMP 40 CFR 68.65 (Process Safety Information)CCPS RBPS Element 6 (Process Knowledge Management)MSIHC Rules 1989 Schedule 1 (India)ISO 45001 2018 Cl.7.5 (Documented Information)CCPS Guidelines for Risk Based Process Safety (2007)
When to engage

Triggers that signal the need

An OSHA 1910.119(d) audit findingA revalidation that needs PSI in place firstA major plant modificationAcquisition due diligenceAn initial PSM programme implementation
Industries served

Where Process Safety Information (PSI) OSHA PSM 1910.119(d) applies

Oil & Gas, Upstream

Wellheads, separators, gas compression, FPSO topsides, produced water systems.

UpstreamOffshoreFPSO
Refineries & Petrochemicals

Distillation columns, reactors, heat exchangers, storage spheres, LPG handling.

RefiningPetrochemical
LNG & Gas Processing

Cryogenic exchangers, liquefaction trains, BOG compressors, storage and sendout.

LNGCryogenic
Specialty Chemicals

Reactive systems, batch reactors, solvent handling, runaway reaction scenarios.

ReactiveBatch
Power Generation

Boilers, HRSGs, steam headers, hydrogen systems, ammonia SCR units.

PowerHydrogen
Pharma & Food

Sterile vessels, CIP/SIP, pressure fermenters, solvent recovery, spray dryers.

PharmaFood & Bev
What we deliver

Tangible deliverables

  • A chemical hazard information dossier per (d)(1)
  • A technology information pack per (d)(2)
  • An equipment information register per (d)(3)
  • A walked down P and ID and PFD set
  • Relief device sizing calculations
  • A PSI update procedure with an MOC trigger
Get Started