Trade Secrets OSHA PSM 1910.119(p)
We make sure a trade secret claim never becomes a reason to withhold the information your people need to comply with the standard
Trade Secrets OSHA
PSM 1910.119(p)
OSHA PSM 1910.119(p) is the disclosure element of the standard, and it makes a simple but important point. You must make all the information needed to comply with paragraphs (a) through (o) available to the people who actually use it, which means those who compile the process safety information, those who help with the process hazard analyses, those who write the operating procedures, and those who carry out incident investigations, emergency planning, and compliance audits, and you must do this regardless of any trade secret status the information may carry. Paragraph (p)(2) gives employees and their designated representatives a right to access trade secret information under the conditions set out in 29 CFR 1910.1200(i)(1) of the OSHA Hazard Communication Standard. Our team builds the framework that honours both duties at once, so your legitimate protection of intellectual property never becomes an excuse for withholding safety critical information from the people who keep the plant safe.

How the study is executed
A structured, facilitated process that runs from scope definition through close out and produces defensible, actionable outputs.
Catalogue process information that may be claimed as trade secret, map against PSM element disclosure requirements.
Per (p)(1), build framework ensuring PSI, PHA, procedure development, incident investigation, emergency planning, audit access is not withheld on trade secret basis.
Per (p)(2) and 1910.1200(i), specify employee / representative access mechanism with confidentiality protections where applicable.
Per (p)(3), develop confidentiality agreement template, integrate with HR and legal governance.
Align with OSHA HazCom 1910.1200 trade secret disclosure framework, integrate with SDS and GHS related work.
Document disclosure decisions and confidentiality agreements, integrate with PSM (o) compliance audit.

What the study covers in full
Outcomes of Trade Secrets OSHA PSM 1910.119(p)
- The information that keeps the plant safe reaches the people who need it
- The quality of your hazard analyses, procedures, and investigations is preserved
- Operators can see the chemical hazard information they rely on
- A documented disclosure trail gives you a record that stands up to scrutiny
- A defensible record under OSHA 1910.119(p)
- Full alignment with OSHA HazCom 1910.1200
- Conformance with CCPS RBPS Element 2 on standards
- Coverage of REACH, GHS, and India GSR 1132
- Better hazard analyses because the people doing them can see the full picture
- Cleaner incident investigations with nothing held back
- Stronger sharing of information with your contractors
- Tight integration with your intellectual property and legal governance
- You avoid a regulatory citation
- You reduce the cost of incidents that come from missing information
- You hold a strong legal position
- Your intellectual property stays protected through structured confidentiality
Codes & standards we work to
Triggers that signal the need
Where Trade Secrets OSHA PSM 1910.119(p) applies
Wellheads, separators, gas compression, FPSO topsides, produced water systems.
Distillation columns, reactors, heat exchangers, storage spheres, LPG handling.
Cryogenic exchangers, liquefaction trains, BOG compressors, storage and sendout.
Reactive systems, batch reactors, solvent handling, runaway reaction scenarios.
Boilers, HRSGs, steam headers, hydrogen systems, ammonia SCR units.
Sterile vessels, CIP/SIP, pressure fermenters, solvent recovery, spray dryers.
Tangible deliverables
- A trade secret inventory and disclosure framework
- An employee access mechanism under paragraph (p)(2)
- A confidentiality agreement template under paragraph (p)(3)
- Integration with HazCom 1910.1200
- Documentation that stands up to scrutiny
- Integration with your intellectual property and legal governance
Ready to start your project?
Speak with our team to scope an engagement tailored to your facility, regulatory context, and lifecycle stage.