Skip to content
Process Safety Management Systems

Asset Integrity and Reliability (RBPS Element 10)

Risk based inspection, reliability centred maintenance, fitness for service and integrity operating windows that keep ageing assets fit for service and free of incidents

What this study delivers

Asset Integrity and Reliability
(RBPS Element 10)

Asset Integrity is the lifecycle discipline that keeps pressure vessels, piping, rotating equipment, storage tanks, pipelines and safety critical instrumentation fit for service as they age. The element maps to OSHA 1910.119(j) and it brings together risk based inspection to API 580 and 581, reliability centred maintenance to SAE JA1011, fitness for service to API 579 1, damage mechanism cataloguing to API RP 571, integrity operating windows to API RP 584 and asset management to ISO 55001. The failure pattern is well documented and it runs to corrosion under insulation on insulated piping, high temperature hydrogen attack on hydrogen service steels, microbiologically influenced corrosion on water bottomed tanks and stress corrosion cracking in chloride and amine service. The element exists so that our team can detect and manage these mechanisms systematically before they cause a loss of containment.

Asset Integrity and Reliability (RBPS Element 10) Overview
Study execution

How the study is executed

A structured, facilitated process that runs from scope definition through close out and produces defensible, actionable outputs.

Asset Register and Criticality

We build an asset hierarchy to ISO 14224, score criticality on safety, environmental and production grounds and align it with the safety critical element register expected by the UK HSE.

Damage Mechanism Catalogue

Following API RP 571 we catalogue mechanisms such as thinning, high temperature hydrogen attack, hydrogen induced cracking, stress corrosion cracking, corrosion under insulation and microbial corrosion and map the corrosion loops against chemistry, temperature and velocity.

Inspection and Maintenance Programme

We build risk based inspection worksheets to API 580 and 581, a reliability centred maintenance failure mode analysis to SAE JA1011 and the resulting inspection and maintenance strategy.

Fitness for Service and Run Repair Replace

We perform API 579 1 Level 1, 2 and 3 assessments, re rate the remaining strength factor and the maximum allowable working pressure and integrate the result with management of change and PHA revalidation.

Integrity Operating Window Programme

Following API RP 584 we set critical, standard and informational windows, build DCS monitoring with an excursion workflow and a mechanical integrity engineering review.

Asset Integrity Governance

We put in place an ISO 55001 aligned system with a KPI cascade, an annual self audit and a triennial third party audit, and the evidence needed for OSHA PSM mechanical integrity.

Asset Integrity and Reliability (RBPS Element 10) Scope
Study scope

What the study covers in full

We run a mechanical integrity programme to OSHA 1910.119(j)
We carry out risk based inspection to API RP 580 and 581
We apply reliability centred maintenance to SAE JA1011
We perform fitness for service to API 579 1 and ASME FFS 1
We set integrity operating windows to API RP 584
We manage pipeline integrity to ASME B31.8S, API 1160 and PNGRB in India
Why it matters

Outcomes of Asset Integrity and Reliability (RBPS Element 10)

Integrity Failure Prevention
  • We manage corrosion under insulation, high temperature hydrogen attack, stress corrosion cracking and microbial corrosion
  • We sustain pressure vessel integrity through the life of the asset
  • We prevent excursions outside the integrity operating window
  • We integrate the proof test programme for safety critical elements
Mechanical Integrity, RBI and FFS Strength
  • We give you a confident response on OSHA PSM (j) mechanical integrity
  • We produce evidence that holds firm through an API 510, 570, 653, 580 and 579 1 review
  • We align with PNGRB, the Indian Boiler Regulations and OISD STD 130 in India
  • We satisfy ISO 55001 asset management
Reliability and Inspection Efficiency
  • We optimise inspection so that intervention drops by 30 to 50 percent
  • We give you clarity on whether to run, repair or replace based on fitness for service
  • We improve turnaround planning
  • We reduce unplanned shutdown
Asset Integrity Programme ROI
  • We help you avoid the cost of a loss of containment incident
  • We optimise inspection cost
  • We build a strong position with insurers through the integrity programme
  • We extend asset life
Standards & references

Codes & standards we work to

CCPS Guidelines for Risk Based Process Safety (2007)CCPS RBPS Element FrameworkFactories Act 1948 41B (India)MSIHC Rules 1989 (India)
When to engage

Triggers that signal the need

An OSHA PSM (j) audit findingA refresh of the API 510, 570 and 653 inspection programmeA damage mechanism surfaced through inspectionA management of change that needs a fitness for service assessmentAn asset life extension decision
Industries served

Where Asset Integrity and Reliability (RBPS Element 10) applies

Oil & Gas, Upstream

Wellheads, separators, gas compression, FPSO topsides, produced water systems.

UpstreamOffshoreFPSO
Refineries & Petrochemicals

Distillation columns, reactors, heat exchangers, storage spheres, LPG handling.

RefiningPetrochemical
LNG & Gas Processing

Cryogenic exchangers, liquefaction trains, BOG compressors, storage and sendout.

LNGCryogenic
Specialty Chemicals

Reactive systems, batch reactors, solvent handling, runaway reaction scenarios.

ReactiveBatch
Power Generation

Boilers, HRSGs, steam headers, hydrogen systems, ammonia SCR units.

PowerHydrogen
Pharma & Food

Sterile vessels, CIP/SIP, pressure fermenters, solvent recovery, spray dryers.

PharmaFood & Bev
What we deliver

Tangible deliverables

  • An asset register with criticality ranking
  • A damage mechanism catalogue to API RP 571
  • A risk based inspection and reliability centred maintenance programme per asset
  • Fitness for service assessments to API 579 1
  • An integrity operating window register to API RP 584
  • An asset integrity governance framework to ISO 55001
Get Started

Ready to start your project?

Speak with our team to scope an engagement tailored to your facility, regulatory context, and lifecycle stage.