Facility Siting Studies
We assess occupied building risk and optimise siting under API 752 and 753
Facility Siting
Studies
A facility siting study assesses the risk to your people in occupied buildings from fire, explosion and toxic release events across a process industry site. Our team determines whether each building is appropriately sited and constructed, and we recommend the upgrades you need wherever occupant risk exceeds tolerable levels. We follow the API 752 and 753 methodology throughout so that the conclusions are anchored in recognised practice and defensible to your regulator and insurer.

How the study is executed
A structured, facilitated process that runs from scope definition through close out and produces defensible, actionable outputs.
Compile building register with classification (permanent/portable/tent per API RP 752/753/756), structural type (brick/modular/BRM), occupancy (peak persons, occupied hours, staff vs contractor), and GPS coordinates, cross map to site layout and process unit proximity.
Select VCE / BLEVE scenarios from FERA / CDM study per unit, apply Multi Energy, Baker Strehlow Tang, or FLACS overpressure modelling, calculate side on overpressure, duration, and positive impulse at each building location.
Apply ASCE Petrochemical Energy Committee fragility curves per structural type (brick, portal frame, modular) to derive damage state (minor/moderate/major/collapse), calculate personnel fatality and injury probabilities per Pietersen / Stephens probit functions.
Calculate thermal dose at each building from pool fire / jet fire / fireball scenarios, assess skin burn, structural ignition, and HVAC driven toxic infiltration to AEGL 2 / SLOT, determine shelter in place viability per air change rate and exposure duration.
Calculate IRPA and PLL per building, plot against API RP 752 tolerability criteria (TRIR < 1×10⁻³ for workers), rank buildings by risk level, identify buildings above tolerable threshold requiring upgrade action.
Appraise options per building, BRM (Blast Resistant Module), structural reinforcement, relocation, demolition, occupancy reduction, develop cost benefit basis, issue priority ranked action plan with timeline, risk reduction quantification, and 5 year re assessment trigger matrix.

What the study covers in full
Outcomes of Facility Siting Studies
- We protect the people in your control room, administration buildings and temporary cabins from explosion
- We identify the buildings at unacceptable risk so they get priority action
- We prevent fatalities from structural collapse in a blast event
- We document the tolerable risk basis for each occupied building
- We address the occupied building consideration in your OSHA PSM process hazard analysis
- We follow the API 752 and 753 methodology
- We implement the CCPS facility siting guidance
- We meet the regulatory focus that followed Buncefield and Texas City
- We tell you whether your muster points and control rooms are adequately located
- We support your siting decisions for contractors and the temporary workforce
- We provide the basis for safe working population limits in at risk areas
- We inform occupancy restrictions for simultaneous operations
- We help you avoid costly post incident litigation by identifying at risk buildings early
- We help you avoid blanket replacement cost through a risk prioritised upgrade programme
- We specify blast resistant buildings to the right standard so you do not over engineer them
- We document due diligence for your insurance and legal purposes
Codes & standards we work to
Triggers that signal the need
Where Facility Siting Studies applies
Wellheads, separators, gas compression, FPSO topsides, produced water systems.
Distillation columns, reactors, heat exchangers, storage spheres, LPG handling.
Cryogenic exchangers, liquefaction trains, BOG compressors, storage and sendout.
Reactive systems, batch reactors, solvent handling, runaway reaction scenarios.
Boilers, HRSGs, steam headers, hydrogen systems, ammonia SCR units.
Sterile vessels, CIP/SIP, pressure fermenters, solvent recovery, spray dryers.
Tangible deliverables
- Building inventory with occupancy and structural data
- Consequence modelling results per building location
- Occupied building risk assessment worksheets per API 753
- Building risk ranking and tolerable risk comparison
- Upgrade options appraisal with cost and benefit analysis
- Action plan with priority ranking and timelines
- Facility siting study report
- Ongoing monitoring and revalidation schedule