We identify hazards at a level broader than process deviation, early enough that layout, inventory and basis of safety can still move

What this study delivers

HAZID
Studies

A HAZID is systematic about hazard source rather than deviation. It asks what could harm people, the environment, the asset or the business at all, which brings in the things a HAZOP will never raise: the control room inside a blast footprint, the flood that takes the substation, the contractor population during a turnaround, the residues left in a vessel at decommissioning. Because it works from a process description, an inventory and a plot plan rather than from a firm P&ID, it belongs at early design and front end engineering, ahead of the detailed design HAZOP, where its output defines the hazard set the design has to answer. It is not a concept stage exercise. Run against a block diagram with no inventory and no layout the team has nothing to bite on and produces hazards that could have been listed without them in the room. The same method also covers technology transfer, pilot and kilo scale before a first campaign, facility siting, and the construction, turnaround and decommissioning phases that no design stage study looks at.

HAZID Studies Overview
Study execution

How the study is executed

We open at scope & basis of design and close at report & close out support, and each stage hands the next one a record rather than a summary of it.

Scope & Basis of Design

Define study boundaries, review P&IDs, PFDs, and process descriptions to establish the engineering basis.

Node / Team Preparation

Divide the system into logical nodes, brief the multidisciplinary team on guide words, deviations, and agenda.

Systematic Assessment

Apply structured methodology to identify deviations, causes, consequences, safeguards, and risk ranking for each node.

Consequence Evaluation

Evaluate credible worst case consequences and existing safeguard adequacy against applicable risk criteria.

Recommendations & Ranking

Develop prioritised action items, assign ownership, and classify by risk reduction potential.

Report & Close Out Support

Issue defensible report, support action close out tracking and revalidation at defined intervals.

HAZID Studies Scope
Study scope

What the study covers in full

We apply a guideword register covering chemical and reaction, containment, fire and explosion, layout and siting, external and natural, occupational and organisational, and construction and decommissioning
We select the categories that fit your scope and lifecycle stage, and record in the terms of reference why any category is excluded
We hold the study where its findings can still move layout, separation, inventory and basis of safety
We chair independently of the design and of the operation of the system under review
We develop consequences to a stated receptor covering people, environment, asset and continuity, rather than defaulting to one
We credit only safeguards that exist at the time of the study, not those the project intends to install
We record the study element and the guideword behind every entry, so coverage can be demonstrated rather than asserted
We refer findings onward to HAZOP, LOPA, QRA, facility siting or calorimetry rather than closing them qualitatively
We cover construction, commissioning and decommissioning, which is the category most often dropped and the one no HAZOP recovers
Why it matters

Outcomes of HAZID Studies

Hazard Source Coverage
  • We find hazards a deviation study is not designed to raise
  • We reach layout, external events and occupational exposure
  • We cover the construction and decommissioning phases
  • We put the hazard set in front of the design that has to answer it
Hazard Identification Compliance
  • We work to ISO 17776 and the CCPS hazard evaluation procedures
  • We support the PHA obligation under OSHA PSM and the MSIHC Rules
  • We feed the hazard inventory a process safety programme is prioritised from
  • We document category exclusions rather than leaving them silent
Project Readiness
  • We give the project a defensible hazard register at stage gate
  • We identify the information the design still has to produce
  • We make the later HAZOP shorter by settling the hazard set first
  • We give turnaround and decommissioning planning a real hazard basis
Early Intervention Value
  • We catch layout and inventory issues while they are still cheap to change
  • We avoid late design change driven by a hazard found at HAZOP
  • We size the study to the stage rather than running a HAZOP too early
  • We reduce the contractor exposure that drives turnaround cost
Standards & references

Codes & standards we work to

ISO 17776 (identification of hazardous events)CCPS Guidelines for Hazard Evaluation Procedures (3rd Ed.)CCPS Risk Based Process Safety (Hazard Identification and Risk Analysis element)IEC 61882 (boundary with HAZOP)OSHA 29 CFR 1910.119(e)ISO 31000 (risk management framework)MSIHC Rules 1989 (India)Factories Act 1948 Section 41B (India)
When to engage

Triggers that signal the need

Early design or FEED on a capital project, ahead of the detailed design HAZOPPilot or kilo scale before the first campaign of new or modified chemistryTechnology transfer into a site, before the transfer is acceptedConstruction within or adjacent to an operating facilityShutdown, turnaround, mothballing or decommissioningNon process infrastructure with real hazard potential, including solvent and gas storage, thermal fluid plant and effluent treatmentA significant incident, audit finding or regulatory requestEstablishing or refreshing a site hazard inventory
Industries served

Where HAZID Studies applies

Oil & Gas, Upstream
UpstreamOffshoreFPSO
Refineries & Petrochemicals
RefiningPetrochemical
LNG & Gas Processing
LNGCryogenic
Specialty Chemicals
ReactiveBatch
Power Generation
PowerHydrogen
Pharma & Food
PharmaFood & Bev
What we deliver

Tangible deliverables

  • Terms of reference with the guideword categories selected and exclusions justified
  • HAZID worksheets recording study element, guideword, event, causes, consequences, safeguards and ranking
  • Risk ranked recommendation register with owners and dates
  • Referral register showing which findings go to HAZOP, LOPA, QRA, facility siting or calorimetry
  • Hazard register for the site or project
  • Study report with team, documents and revisions recorded
  • Revalidation trigger and interval
Get Started

Send us the scope

We will scope HAZID Studies against your site and come back with what it would take. Send us the unit, the P&ID revision it sits at and the inventory it holds.