Skip to content
Lean and Cost Optimisation

Lean Manufacturing

We turn the Toyota Production System into your daily operating reality through value stream design, waste elimination and lean daily management

Programme overview

Lean
Manufacturing

Lean works when it becomes the way a plant runs every day rather than a one off event. Our team turns the Toyota Production System philosophy into operating reality through value stream mapping, pull systems, takt time alignment, one piece flow and 5S workplace organisation, all sustained by kaizen events and lean daily management. We deliver lean as a complete operating system rather than a loose toolkit, redesigning your value streams from end to end instead of leaving you with a handful of isolated improvements.

Lean Manufacturing Overview
How we deliver it

Our implementation model

We fix the standards that apply to your site before we open at value stream mapping, and we do not close at lean sustainment until they are met.

Value Stream Mapping

Map current state value streams, identify value adding vs non value adding activities, quantify lead time, process time, and inventory levels.

Waste Identification (7+1)

Identify the 7 wastes plus underutilised talent, transportation, inventory, motion, waiting, overproduction, overprocessing, defects.

Future State Design

Design lean future state with takt time alignment, pull systems, one piece flow, and visual management, quantify improvement potential.

5S Workplace + Kanban

Deploy 5S (Sort/Set/Shine/Standardise/Sustain), design Kanban pull signals for inventory and production scheduling.

Kaizen Events & Continuous Flow

Facilitate kaizen events for rapid improvement, standardise work, implement single piece flow where economically feasible.

Lean Sustainment

Embed lean daily management, gemba walks, A3 problem solving, and continuous improvement governance into operating rhythm.

What the programme covers

Lean in full scope

We map your value streams from current state to future state
We identify the eight wastes including transport, inventory, motion, waiting, overproduction, overprocessing, defects and underused skill
We organise the workplace with 5S
We design pull systems and Kanban
We facilitate kaizen events
We embed lean daily management so the gains hold
Lean Manufacturing Coverage
Business value

Value of Lean Manufacturing

Stability and Standard Work
  • Standard work reduces the variability that drives incidents
  • 5S removes everyday workplace hazards
  • Engaged operators report hazards far more readily
  • Visual management makes abnormal conditions obvious at a glance
Process Compliance
  • ISO 9001 process discipline runs through the operation
  • Standard work that you can defend confidently in any review
  • Process control aligned with Sarbanes Oxley
  • Confidence walking customers through your floor at any time
Lean Performance
  • Lead time typically falls by 20 to 50 percent
  • Inventory typically falls by 30 to 60 percent
  • Productivity typically rises by 20 to 40 percent
  • Quality improves as standard work takes hold
Lean Cost Efficiency
  • Leaner inventory releases working capital
  • Operating cost comes down
  • The cost of poor quality falls
  • Higher productivity lets you avoid capacity capital spend
Standards & references

Codes & standards we work to

Toyota Production System TPSLean Enterprise Institute PrinciplesWomack and Jones Lean ThinkingShingo Model for Operational ExcellenceLean Six Sigma Black Belt Body of KnowledgeHoshin Kanri Strategy Deployment
When to engage

Triggers that signal the need

Cost pressure that demands a step change in efficiencyLead times that have become uncompetitiveExcess inventory tying up working capitalA new greenfield line to designA merger or acquisition that requires operational harmonisation
Industries served

Where Lean Manufacturing applies

Oil & Gas, Upstream
UpstreamOffshoreFPSO
Refineries & Petrochemicals
RefiningPetrochemical
LNG & Gas Processing
LNGCryogenic
Specialty Chemicals
ReactiveBatch
Power Generation
PowerHydrogen
Pharma & Food
PharmaFood & Bev
What we deliver

Tangible deliverables

  • Value stream maps for current and future state
  • Waste register with an elimination plan
  • 5S audit framework
  • Pull and Kanban design
  • Kaizen event playbook
  • Lean daily management standard work
Get Started

Send us the scope

We will scope Lean Manufacturing against your site and come back with what it would take. Tell us where the process is losing time, yield or margin.