The PSI dossier — chemistry, technology, equipment — kept current through MOC
Process Knowledge Management is the living dossier of everything a site needs to know about its process to operate it safely — chemical hazards, reaction kinetics, equipment ratings, P&IDs, electrical classification, relief device sizing, control logic, and operating envelopes. It maps onto OSHA PSM 1910.119(d) Process Safety Information. Bhopal, Texas City, and BP Macondo each included PSI findings in their investigations — operators making decisions on documentation that no longer matched the plant.

Process knowledge is the single most leveraged asset an operating organisation has. Every decision — operational, engineering, MOC, emergency response — depends on it. An organisation with accurate, accessible, current PSI operates with confidence; without it, every decision carries hidden risk. PSI quality directly correlates with PHA quality, MOC discipline, and incident-investigation depth.
Process Knowledge Management is the prerequisite for Hazard Identification & Risk Analysis (Element 7) — without accurate PSI, PHAs operate on bad data. It also feeds Operating Procedures (Element 8), Asset Integrity (Element 10), MOC (Element 13), and Incident Investigation (Element 17). RBPS positions PKM as the first element of Pillar 2 because every downstream risk-management activity rests on it.
A focused 6-step methodology calibrated to deliver process knowledge management as a working capability — not a documented compliance artefact.
Inventory required PSI per OSHA 1910.119(d) — chemical, technology, equipment; identify current state, gaps, and version control issues.
Specify document hierarchy, naming conventions, version control, access control; integrate with EDMS (Aveva PI, Documentum, OpenText).
Walk down P&IDs against field reality; update markups; reissue as as-built; cross-check with HAZOP / PHA records.
Compile equipment datasheets, MOC, MAWP, MAOP, relief device sizing per API 520/521/2000; align with mechanical integrity register.
Define MOC procedure trigger for PSI update; enforce update before MOC closure; track PSI lag time as a leading KPI.
Ensure operating teams have read access to PSI relevant to their unit; train on PSI navigation; integrate with shift handover.
Decision-gated workflow showing the actual sequence of activities — from initiation through steady-state operation — with key decision points highlighted.
We can scope this element implementation against your facility, regulatory context, and existing management-system maturity — and integrate it with the other Risk Based Process Safety (RBPS) elements you already operate.